Skip to main content

The carrier workflow and the downstream squeeze

Carriers are Phase 2, but receivers will demand clean handover data from October 2026. Here is the downstream squeeze, what to capture, and how to supply it from a photo.

Carriers are formally a Phase 2 duty holder with an October 2027 deadline. In practice your real deadline is a year earlier. This article explains why, what you should capture, and how LoadSnap lets you supply clean handover data without heavy software.

Your duty under Phase 2

As a carrier you record the waste movements you transport, capturing the journey from the point of production. Brokers and dealers do the same for movements they arrange, with their registration and authorisation numbers attached.

Why October 2027 is not your real deadline

From October 2026, receiving sites must record every inbound load digitally, and your details form part of that record. To create a clean record, receivers need clean digital handover data from you. So they will start asking for it a full year before your own mandate begins, and a load that turns up without it can be refused at the gate. The risk here is lost loads and lost contracts, not just a future penalty.

The capture, from the driver's side

In LoadSnap a collection is a photo and a tap. The driver picks the producer, takes a photo of the load, and the AI suggests the waste type, EWC codes, container and hazardous flag to confirm. That becomes a digital record with the photo, codes and a timestamp, ready to hand over.

  1. Open LoadSnap and tap Submit, then Submit a Collection.

  2. Pick the producer, the site the waste came from.

  3. Take a photo of the load.

  4. Check the AI suggested waste type, EWC code, container and hazardous flag, and adjust anything that is not right.

  5. Add the container and quantity, then continue and submit.

Screenshot goes here: the Submit a Collection screen with the producer picker open.

Screenshot goes here: the AI classification result after a load photo, showing the suggested waste type, EWC code, container and hazardous flag ready to confirm.

What to do now

  • Begin software readiness rather than waiting for 2027

  • Get clean EWC code and waste description practices in place, because that is the data receivers will check

  • Watch for the Phase 2 API documentation, expected autumn 2026

Related: What DEFRA Phase 2 covers. Am I affected by Digital Waste Tracking. Carrier licence checks.

Did this answer your question?