Skip to main content

Digital Waste Tracking for carriers

Carriers are Phase 2 (planned October 2027), but the downstream squeeze makes October 2026 your real deadline. Your duty, what to do now, and how LoadSnap and Connect help.

You are a Phase 2 duty holder on paper, but your real deadline is a year earlier. Here is your whole situation in one place.

Your deadline, and your real deadline

Carriers are formally mandatory from October 2027, which is planned and has moved before. But from October 2026 receiving sites must record your details on every inbound load, so they will demand clean digital handover data from you a year ahead. A load that turns up without it can be refused at the gate. That is the downstream squeeze, and it makes October 2026 your real deadline.

Your duty

You record the waste movements you transport, capturing the journey from the point of production.

What to do now

  • Get your EWC codes and waste descriptions clean, because that is the data receivers will check

  • Begin software readiness rather than waiting for 2027

  • Watch for the Phase 2 API documentation, expected autumn 2026

How LoadSnap helps

Capture a collection from a photo, let the AI classify the waste, and hand clean data to the sites you deliver to. With LoadSnap Connect, your load links straight into a receiver's receipt, so the handover is a scan rather than a re-type.

Related: What DEFRA Phase 2 covers. The carrier workflow and the downstream squeeze. Introducing LoadSnap Connect. Drivers. Vehicles.

Did this answer your question?